3LYNX.VSM · Value stream design
Draw the value stream. Watch it run.
3LYNX.VSM is a value stream mapping app in the browser. The figures update while you draw – and one click turns the map into a 3LYNX.CORE simulation, with variability, failures, shifts and people.
Video description
A value stream map is drawn: supplier, stamping, welding, paint oven, assembly and customer, with inventories in between and a customer demand of 450 pieces per day. Live figures appear: load bars, welding marked as the bottleneck at 93 percent load, a lead time of 4.95 days with 1.4 percent value added. Then the value stream is simulated: lots flow, inventories rise and fall, and a result tile compares output with demand. The video has no sound.
Where does the time go – really?
The bottleneck on paper is not always the one on the shop floor.
A value stream map shows where time goes. Usually it shows averages. Real lines have failures, changeovers, shifts and shared tools. 3LYNX.VSM keeps the simple language of value stream mapping and adds the behaviour over time.
3LYNX.VSM in action
The app, from drawing to simulation.
Screens of the real app with the example value stream of a housing line (no customer data): one more welding machine moves the bottleneck on paper, the simulation shows what really limits the line.
Video description
Screens of the real 3LYNX.VSM app with the example value stream of a housing line: the value stream is opened, the welding process is selected and a third machine is added, the bottleneck on paper moves to assembly. Then Simulate runs 3LYNX.CORE and shows 429 pieces per working day against a demand of 450, with stamping as the simulated bottleneck. Finally the floor plan view. The video has no sound.
Live figures
Draw like on a whiteboard. Get the figures at once.
Supplier, processes, inventories, transports and customer, placed with mouse or touch. Customer takt, load including changeovers, inventory range, the lead time ladder and the value added share update while you draw. The bottleneck is marked as soon as it exists. Tools and workpiece carriers are part of the map, so a fixture shared by two machines shows its load.

Future state
Current state and future state, side by side.
Turn an inventory into a FIFO lane or a supermarket with a kanban loop, or limit the work in the line with CONWIP. 3LYNX.VSM suggests the number of kanban cards per product from demand and replenishment time – and the simulation shows whether they are enough.
Duplicate the current state, change it, simulate both and compare: load, lead time, value added, inventory range, transport distance, output and the simulated bottleneck – each with the difference and whether it got better or worse. In the example the future state with a supermarket in front of the paint oven delivers 444 instead of 429 pieces a day, and the lead time drops from 1.03 to 0.31 working days.

Layout and data
On the floor plan. From your data.
Place the processes on the floor plan of the hall, on top of a scanned plan or a CAD export. Flow lines show the pieces per day and the distance of every leg; transport times follow from the distances.
Import the operation confirmations from your ERP or MES as CSV or Excel. 3LYNX.VSM derives the routes, cycle times, changeovers, machines, batch processes, shifts, demand and inventories – and keeps the measured lead time as the reference for the simulation.
- Draw or import the value stream.
- See the figures live: takt, load, inventory range, lead time ladder, bottleneck.
- Simulate with 3LYNX.CORE: one click, with failures, shifts, people and tools.
- Compare alternatives: current and future state side by side.

Follow the Lynx
Understand the system. Understand the decision.
Tell us about the decision in front of you. We start small, with the relationships that matter.